| Vendor |
Project # |
Contract # |
Title |
Date Awarded |
Contract Term |
Contract Type |
Original Amount |
|
Change Orders |
Final Amount |
Funding Source |
Procurement Type |
| All Phase Electric Supply |
CSBH-08 |
CSBH-08C-MA2 |
CSBH WB Redevelopment-Light Poles & Fixtures Procurement |
20-Apr-2011 |
4/20/11-12/31/11 |
Materials Agreement |
$54,195.77 |
|
$0.00 |
$54,195.77 |
POA General Fund |
Competitive |
| All Phase Electric Supply |
CSBH-08 |
CSBH-08C-MA3 |
CSBH WB Redevelopment-Power Pedestals Procurement |
20-Apr-2011 |
4/20/11-12/31/11 |
Materials Agreement |
$86,118.76 |
|
$0.00 |
$86,118.76 |
POA General Fund |
Competitive |
| Alpine Fire & Safety Systems |
N/A |
SC #05-09 |
2009-2011 Fire Equip & First Aid Maintenance |
7-Jan-2009 |
1/1/09-12/31/11 |
Service Contract |
$32,400.00 |
|
$0.00 |
$32,400.00 |
POA General Fund |
Competitive |
| Anacortes Chamber of Commerce |
|
SC #08-11 |
2011 Chamber of Sommerce Services |
7-Jul-2011 |
1/1/11-12/31/11 |
Service Contract |
$10,000.00 |
|
|
$10,000.00 |
POA General Fund |
Competitive |
| Anacortes Clean! |
N/A |
SC #03-11 |
Janitorial/Cleaning Services-U.S. Customs & Border Protection Office |
11-Feb-2010 |
1/1/11-12/21/11 |
Service Contract |
$6,780.00 |
|
$0.00 |
$6,780.00 |
POA General Fund |
Competitive |
| APT Environmental Solutions |
N/A |
TO#01-10 |
Evaluation of Indoor Work Environment |
26-Oct-2010 |
10/26/10-1/31/11 |
Professional Services |
$7,300.00 |
|
|
$7,300.00 |
POA General Fund |
Competitive |
| Bellingham Marine Industries |
CSBH-08C |
CSBH-08C |
CSBH West Basin Redevelopment - Concrete Float Procurement |
26-Apr-2011 |
31-Dec-2011 |
Materials Agreement |
$2,532,962.00 |
|
|
$2,532,962.00 |
Gen Fund/BIG Grant |
Competitive |
| BrickKicker, The |
N/A |
TO #02-11 |
Property Inspection of 502 3rd Street House |
27-Jun-2011 |
|
Professional Services |
$395.00 |
|
|
$395.00 |
General Fund |
Competitive |
| Chinook Enterprises |
N/A |
SC #15-11 |
2010 Grounds Maintenance |
2-Mar-2010 |
2/1/11-11/30/11 |
Service Contract |
$46,247.76 |
|
$0.00 |
$46,247.76 |
POA General Fund |
Competitive |
| Coast & Harbor Engineering |
ENV-01C |
TO #02-10 |
Scott Site Cleanup-Phase 3 Timber Breakwater Decommission |
8-Dec-2010 |
12/08/10-12/31/11 |
Professional Services |
$12,988.00 |
|
$0.00 |
$12,988.00 |
Environmental Fund/DOE |
Competitive |
| Coast & Harbor Engineering |
ENV-01C |
TO #01-10 |
Scott Site Cleanup-Phase 3 MJB Type 4 Cap Matieral Design & Implementation |
17-Dec-2010 |
12/17/10-12/31/11 |
Professional Services |
$17,028.00 |
|
$0.00 |
$17,028.00 |
DOE Grant |
Competitive |
| Coast & Harbor Engineering |
ENV-01C |
TO #03-11 |
Scott Site Cleanup-Phase 3 Engineering Services |
10-Feb-2011 |
02/10/11-12/31/11 |
Professional Services |
$7,500.00 |
|
$0.00 |
$7,500.00 |
Environmental Fund/DOE |
Competitive |
| David Evans & Associates Inc. |
ENV-01B |
TO #01-11 |
Scott Mill Site- Post Construction Survey |
10-Feb-2011 |
02/10/11-12/31/11 |
Professional Services |
$31,616.00 |
|
$0.00 |
$31,616.00 |
Environmental Fund/DOE |
Competitive |
| Decker Construction, Inc. |
PROP-01E |
PROP-01E-SW1 |
T Ave Roadway Improvements- Pier 2 Watermain Relocation |
11-Apr-2011 |
29-Apr-2011 |
Small Works |
$27,807.40 |
|
$4,869.00 |
$32,676.40 |
POA General Fund |
Competitive |
| EDASC |
N/A |
SC #06-11 |
2010 Economic Development Services |
3-Mar-2010 |
1/1/11-12/31/11 |
Service Contract |
$25,000.00 |
|
$0.00 |
$25,000.00 |
POA General Fund |
N/A |
| Elcon Associates |
MRT-13 |
TO #01-11 |
Electrical Design Services - Pier 2 Security Improvements |
11-Jul-2011 |
|
Professional Services |
$32,106.00 |
|
|
$32,106.00 |
ARRA Grant |
Competitive |
| Everton Consulting LLC |
N/A |
SC #01-11 |
Cap Sante Boat Haven Parking Plan |
6-May-2011 |
05/06/11-12/31/11 |
Personal Services |
$5,000.00 |
|
$0.00 |
$5,000.00 |
POA General Fund |
Competitive |
| Geiger's Custom Cleaning |
ENV-01 |
SC #01-10 |
Janitorial/Cleaning Services-Cannery Bldg |
1-Mar-2010 |
2/1/10-4/30/11 |
Service Contract |
$4,000.00 |
|
$0.00 |
$4,000.00 |
DOE Grant |
Competitive |
| GeoEngineers |
N/A |
TO #02-10 |
Scott Site Cleanup-MJB Upland Area Cleanup Oversight |
6-May-2010 |
5/6/10-1/31/11 |
Professional Services |
$24,980.00 |
|
$0.00 |
$24,980.00 |
Environmental Fund/DOE |
Competitive |
| GeoEngineers |
N/A |
TO #09-10 |
Pier 2 Log Haul Out Sediment Area Benthic Testing |
30-Sep-2010 |
09/30/10-12/31/11 |
Professional Services |
$42,825.00 |
|
$0.00 |
$42,825.00 |
Environmental Fund |
Competitive |
| GeoEngineers |
ENV-01B |
TO #06-10 |
Scott Site Cleanup-Construction Completion Report |
1-Dec-2010 |
12/1/10-12/31/11 |
Professional Services |
$249,950.00 |
|
$0.00 |
$249,950.00 |
Environmental Fund/DOE |
Competitive |
| GeoEngineers |
ENV-01C |
TO #10-11 |
Scott Site Cleanup-Phase 3 Construction Management Support |
17-Feb-2011 |
02/17/11-12/31/2011 |
Professional Services |
$64,944.00 |
|
$3,280.00 |
$68,224.00 |
Environmental Fund/DOE |
Competitive |
| GeoEngineers |
ENV-02 |
TO #11-11 |
Former Shell tank Farm- Remedial Investigation Soil and Groundwater Sampling, Analysis and Data Reporting |
10-May-2011 |
05/10/11-12/31/11 |
Professional Services |
$247,463.00 |
|
$0.00 |
$247,463.00 |
Environmental Fund |
Competitive |
| GeoEngineers |
ENV-01C |
TO #12-11 |
Scott Site Cleanup-Phase 3 Post Construction Groundwater Monitoring |
12-May-2011 |
05/12/11-12/31/11 |
Professional Services |
$23,492.00 |
|
$0.00 |
$23,492.00 |
Environmental Fund/DOE |
Competitive |
| GeoEngineers |
PROP-07 |
TO #13-11 |
PSR Office Building-Environmental Construction Support Services |
2-Jun-2011 |
6/2/11-12/31/11 |
Professional Services |
$12,199.00 |
|
$0.00 |
$12,199.00 |
Tax Fund |
Competitive |
| GeoEngineers |
N/A |
TO #14-11 |
Dredged Material Characterization Sampling and Analysis Plan for M,N, O dock Areas at Cap Sante Boat Haven |
13-Jul-2011 |
7/13/11-12/31-11 |
Professional Services |
$12,029.00 |
|
$0.00 |
$12,029.00 |
General Fund |
Competitive |
| GeoEngineers |
MRT-12 |
TO #15-11 |
Pier 2 Storm Water Management System Project - Geotechnical Construction Support |
22-Jul-2011 |
7/2/1-2-31/11 |
Professional Services |
$2,546.00 |
|
$0.00 |
$2,546.00 |
PSP Fund |
Competitive |
| Geo Test Services |
MRT-14 |
TO #05-10 |
Wymans Ramp Rehabilitation Project- Materials Testing |
29-Nov-2010 |
11/29/10-12/31/11 |
Professional Services |
$4,639.00 |
|
$0.00 |
$4,639.00 |
General Fund |
Competitive |
| Geo Test Services |
N/A |
TO #06-11 |
Ground Penetrating Radar Evaluation of Waterline at Pier 2 |
26-Jan-2011 |
01/26/11-12/31/11 |
Professional Services |
$1,400.00 |
|
$0.00 |
$1,400.00 |
General Fund |
Competitive |
| Geo Test Services |
ENV-01C |
TO #07-11 |
Scott Site Cleanup-Phase 3 Material testing Services |
17-Feb-2011 |
02/17/11-12/31/11 |
Professional Services |
$43,217.00 |
|
$0.00 |
$43,217.00 |
Environmental Fund/DOE |
Competitive |
| Grette Associates |
N/A |
TO #03-10 |
Fidalgo Bay Mitigation Site Year 3 Monitoring |
9-Aug-2010 |
8/9/10-4/1/11 |
Professional Services |
$54,679.00 |
|
$0.00 |
$54,679.00 |
POA General Fund |
Competitive |
| Grette Associates |
CSBH-08 |
TO #05-10 |
E & F Dock Replacement- Biological Evaluation |
7-Oct-2010 |
10/07/10-12/31/2011 |
Professional Services |
$2,800.00 |
|
$0.00 |
$2,800.00 |
POA General Fund |
Competitive |
| Grette Associates |
MRT-14 |
TO #04-10 |
Wymans Ramp Rehabilitation Project- Pile Driving Monitoring |
29-Nov-2010 |
11/29/10-12/31/11 |
Professional Services |
$6,611.00 |
|
$0.00 |
$6,611.00 |
POA General Fund |
Competitive |
| Grette Associates |
ENV-01C |
TO #06-11 |
Scott Site Cleanup-Phase 3 Construction Support |
4-Mar-2011 |
03/04/11-12/31/11 |
Professional Services |
$5,000.00 |
|
$0.00 |
$5,000.00 |
Environmental Fund/DOE |
Competitive |
| Grette Associates |
N/A |
TO #09-11 |
Log Pocket Mitigation |
6-Apr-2011 |
04/03/11-12/31/11 |
Professional Services |
$6,404.50 |
|
$0.00 |
$6,404.50 |
POA General Fund |
Competitive |
| Grette Associates |
ENV-01C |
TO #07-11 |
Scott Site Cleanup-Eelgrass Transplant & Monitoring Work Plan |
14-Apr-2011 |
04/14/11-12/31/11 |
Professional Services |
$3,764.00 |
|
$0.00 |
$3,764.00 |
Environmental Fund/DOE |
Competitive |
| Grette Associates |
ENV-01C |
TO #08-11 |
Scott Site Cleanup-Eelgrass Transplant |
6-May-2011 |
05/06/11-12/31/11 |
Professional Services |
$78,626.00 |
|
$0.00 |
$78,626.00 |
Environmental Fund/DOE |
Competitive |
| Grette Associates |
N/A |
TO #010-11 |
Project Pier 1 Eel Grass Monitoring |
22-Jul-2011 |
7/22/11-12/31/11 |
Professional Services |
$57,393.50 |
|
$0.00 |
$57,393.50 |
General Fund |
Competitive |
| Hough, Beck & Baird, Inc. |
ENV-01C |
TO #04-10 |
Scott Site Cleanup-Phase 3 Design |
26-Oct-2010 |
10/26/10-12/31/11 |
Professional Services |
$71,905.00 |
|
$0.00 |
$71,905.00 |
Environmental Fund/DOE |
Competitive |
| Hough, Beck & Baird, Inc. |
ENV-01C |
TO #05-11 |
Scott Site Cleanup-Phase 3 Construction Access Mitigation Design Admin Assistance |
17-Feb-2011 |
02/17/11-12/31/11 |
Professional Services |
$42,913.00 |
|
$0.00 |
$42,913.00 |
Environmental Fund/DOE |
Competitive |
| Industrial Mowing & Spraying |
N/A |
TO# 01-11 |
Port-Wide Vegetation Management |
7-Mar-2011 |
03/01/11-12/31/12 |
Professional Services |
$14,214.23 |
|
$0.00 |
$14,214.23 |
POA General Fund |
Competitive |
| Kennedy Jenks Consultants |
MRT-11 |
TO# 06-11 |
Completion of Pier 2 Stormwater Management System Design |
11-Jan-2011 |
01/11/11-12/31/11 |
Professional Services |
$31,284.00 |
|
$0.00 |
$31,284.00 |
POA General Fund |
Competitive |
| Kennedy Jenks Consultants |
MRT-12 |
TO# 07-11 |
Construction Oversight- Pier 2 Stormwater Management System Design |
22-Mar-2011 |
03/22/11-12/31/11 |
Professional Services |
$87,626.00 |
|
$0.00 |
$87,626.00 |
POA General Fund |
Competitive |
| Kennedy Jenks Consultants |
N/A |
TO# 08-11 |
On-Call Stormwater Assistance |
20-Apr-2011 |
04/20/11-12/31/11 |
Professional Services |
$13,025.00 |
|
$0.00 |
$13,025.00 |
POA General Fund |
Competitive |
| Kreider Construction |
ENV-01C |
ENV-01C-SW1 |
Scott Site Cleanup- Seafarers Memorial Park Building Foundation & Rehabilitation |
7-Jan-2011 |
01/07/11-04/30/11 |
Small Works |
$186,576.02 |
|
$78,030.95 |
$264,606.97 |
Environmental / POA /DOE |
Competitive |
| Lee Dawes |
N/A |
TO #01-11 |
2011 Canon Salute Services |
6-May-2011 |
05/06/11-12/31/11 |
Service Contract |
$2,000.00 |
|
$0.00 |
$2,000.00 |
POA General Fund |
Competitive |
| Leonard, Boudinot & Skodje |
MRT-14 |
TO #06-10 |
Wyman's Ramp Rehabilitation Project- Construction Services |
6-Nov-2010 |
06/11/10-12/31/11 |
Professional Services |
$16,375.00 |
|
$0.00 |
$16,375.00 |
POA General Fund |
Competitive |
| Leonard, Boudinot & Skodje |
ENV-01C |
TO #07-10 |
Scott Site Cleanup-Phase 3 Surveying Services |
29-Nov-2010 |
11/29/10-12/31/11 |
Professional Services |
$7,500.00 |
|
$0.00 |
$7,500.00 |
Environmental Fund/DOE |
Competitive |
| Leonard, Boudinot & Skodje |
N/A |
TO #08-10 |
PMA 080024 Mapping |
13-Dec-2010 |
12/13/10-12/31/11 |
Professional Services |
$4,930.00 |
|
$0.00 |
$4,930.00 |
POA General Fund |
Competitive |
| Leonard, Boudinot & Skodje |
N/A |
TO #09-11 |
Cap Sante Northend Parking Lot Survey |
25-Jan-2011 |
01/25/11-12/31/11 |
Professional Services |
$1,880.00 |
|
$0.00 |
$1,880.00 |
POA General Fund |
Competitive |
| Materials Testing & Consulting |
MRT-12 |
TO #02-11 |
Materials Testing- Pier 2 Stormwater Management System Design |
22-Mar-2011 |
03/22/11-12/31/11 |
Professional Services |
$13,780.00 |
|
$0.00 |
$13,780.00 |
JDF/Prop Sales |
Competitive |
| Materials Testing & Consulting |
PROP-07 |
TO #03-11 |
Materials Testing-Puget Sound Rope Office Buidling Project |
25-May-2011 |
5/25/11-12/31/11 |
Professional Services |
$4,115.00 |
|
$0.00 |
$4,115.00 |
POA General Fund |
Competitive |
| Meyer Sign & Advertising |
N/A |
Parcel 1 Sign |
Parcel 1 Tenant Sign Project |
3-Mar-2011 |
3/11/11-5/30/11 |
Small Works |
$23,728.26 |
|
$2,338.42 |
$26,066.68 |
POA General Fund |
Competitive |
| Meyer Sign & Advertising |
PROP-08 |
PROP-08-SW1 |
Pier 2 Tenant Signage |
29-Jun-2011 |
6/29/11-8/31/11 |
Small Works |
$24,213.00 |
|
$0.00 |
$24,213.00 |
POA General Fund |
Competitive |
| Nickel Brothers House Moving |
ENV-01B |
ENV-01B-SW1 |
Scott Site Cleanup-Relocate SMP Building |
14-Sep-2009 |
9/14/09-3/1/11 |
Small Works |
$129,731.80 |
|
$0.00 |
$129,731.80 |
DOE Grant |
Competitive |
| PND Engineers Inc. |
N/A |
TO# 02-11 |
Engineering Support (On-Call) |
27-Dec-2010 |
12/27/10-12/31/11 |
Professional Services |
$10,000.00 |
|
$0.00 |
$10,000.00 |
POA General Fund |
Competitive |
| PND Engineers Inc. |
CSBH-08C |
TO #03-11 |
EF Dock Replacement- Fabrication Support Services |
12-May-2011 |
05/12/11-12/31/11 |
Professional Services |
$68,420.00 |
|
$0.00 |
$68,420.00 |
POA General Fund |
Competitive |
| PND Engineers Inc. |
MRT-13 |
TO #04-11 |
Structural Design Services - Pier 2 Security Improvements |
11-Jul-2011 |
7/11/11-12/31-11 |
Professional Services |
$15,870.00 |
|
|
$15,870.00 |
ARRA Grant |
Competitive |
| Richard Ryddell |
N/A |
SC #01-11 |
2011 Town Crier Services |
1-Jun-2011 |
6/1/11-9/30/11 |
Service Contract |
$2,500.00 |
|
$0.00 |
$2,500.00 |
POA General Fund |
Competitive |
| Richards Pipe & Steel, Inc. |
CSBH-08C |
CSBH-08C-MA1 |
CSBH WB Redevelopment-Steel Pipe Pile Procurement |
2-May-2011 |
5/2/11-12/31/11 |
Materials Agreement |
$439,965.00 |
|
$0.00 |
$439,965.00 |
POA General Fund |
Competitive |
| Roosendaal-Honcoop Construction |
PROP-07 |
PROP-07 |
Puget Sound Rope Office Building |
3-May-2011 |
5/3/11-1/31/12 |
Construction Contract |
$716,284.00 |
|
$18,110.31 |
$734,394.31 |
Property Sales Fund |
Competitive |
| Shasta Willson |
N/A |
SC #01-10 |
Project Management Database Services |
23-Aug-2010 |
06/04/11-09/24/11 |
Service Contract |
$7,000.00 |
|
$0.00 |
$7,000.00 |
POA General Fund |
Competitive |
| Schwetz Construction, Inc. |
MRT-14 |
MRT-14 |
Construction Contract for Wymans Ramp Rehabilitation |
27-Jul-2010 |
12/1/10-03/30/11 |
Construction |
$382,144.07 |
|
$0.00 |
$382,144.07 |
POA General Fund |
Competitive |
| Skagit Council of Governments |
N/A |
SC # 03-11 |
2011 Skagit Council of Government Services |
27-Dec-2010 |
01/01/11-12/31/11 |
Service Contract |
$9,053.00 |
|
$2,500.00 |
$11,553.00 |
POA General Fund |
Competitive |
| Sound Development Group |
PROP-01E |
TO# 05-11 |
T Ave Roadway Improvements- Pier 2 Watermain Relocation |
19-Feb-2011 |
02/19/11-12/31/11 |
Professional Services |
$1,025.00 |
|
$0.00 |
$1,025.00 |
JDF Grant |
Competitive |
| Sound Development Group |
N/A |
TO# 06-11 |
Parcel 1 Sign Exhibit |
23-Feb-2011 |
02/23/11-12/31/11 |
Professional Services |
$800.00 |
|
$0.00 |
$800.00 |
POA General Fund |
Competitive |
| Stephen Berentson |
N/A |
TO # 02-11 |
2011 Public Relations Services |
7-Jan-2011 |
01/07/11-12/31/11 |
Professional Services |
$10,000.00 |
|
$0.00 |
$10,000.00 |
POA General Fund |
Competitive |
| Strider Construction |
ENV-01C |
ENV-01C |
Former Scott Paper Mill Cleanup Site - PHASE 3 |
9-Feb-2011 |
2/9/11-5/30/11 |
Construction Contract |
$865,141.19 |
|
$136,863.86 |
$1,002,005.05 |
POA General Fund |
Competitive |
| Strider Construction |
MRT-12 |
MRT-12 |
Pier 2 Storm Water Management System Project |
7-Apr-2011 |
4/7/11-10/31/11 |
Construction Contract |
$1,902,156.00 |
|
$28,962.16 |
$1,931,118.16 |
JDF/POA Gen Fund |
Competitive |
| Underwood & Associates |
PROP-07 |
TO #02-10 |
Puget Sound Rope Office Building |
22-Oct-2010 |
10/22/10-02/31/12 |
Professional Services |
$99,736.00 |
|
$0.00 |
$99,736.00 |
Property Sales Fund |
Competitive |
| Wanda Mull Production Company |
N/A |
SC #01-10 |
Government Access Channel Production Services |
24-Feb-2010 |
1/1/10-12/31/12 |
Service Contract |
$50 per meeting |
|
$0.00 |
$50 per meeting |
POA General Fund |
Competitive |
| WHPacific |
ENV-01C |
TO #01-10 |
Scott Site Cleanup-Phase 3 Design/ 2011 Site Restoration Elements |
29-Oct-2010 |
08/2/10-5/27/11 |
Professional Services |
$164,635.00 |
|
$0.00 |
$164,635.00 |
Environmental Fund/DOE |
Competitive |
| WHPacific |
ENV-01C |
TO #02-11 |
Scott Site Cleanup-Phase 3 Construction Management Services |
17-Feb-2011 |
02/17/11-05/13/11 |
Professional Services |
$170,730.00 |
|
$0.00 |
$170,730.00 |
Environmental Fund/DOE |
Competitive |
| WHPacific |
MRT-12 |
TO #03-11 |
Pier 2 Emergency Sanitary Sewer Discharge |
14-Jul-2011 |
07/14/11-10/31/11 |
Professional Services |
$4,468.00 |
|
$0.00 |
$4,468.00 |
PSP Fund |
Competitive |
|